Installation
Instructions |
| Tiffany (Base) Gazebo Kit Includes: |
| Qty. |
|
| 8 |
Posts (L) |
| 8 |
2" x 6" Rafters (G) |
| 16 |
1" x 6" Dowel Pins |
| 7 |
Lower Rail Sections (K) |
| 8 |
Upper Rail Sections (M) |
| 8 |
Fascia Boards (H) |
| 8 |
T & G (tongue & grove) Roof
Sections (A) |
| 8 |
Rafter End Caps (N) |
| 1 |
Center Support (D) |
| 1 |
Center 4" diameter Core |
| 2 |
Center Support Caps (D) |
| 1 |
Center Top Rain Collar (E) |
| 1 |
Cable Kit |
| 48 |
Stainless Steel Screws |
| 16 |
Snap Screw Covers |
| 1 |
Tube of Christies Red Hot Glue |
| 1 |
Univerisal Post Kit (Tiffany Premiere
only) |
|
| Pagoda Roof Includes: |
| Qty |
|
| 8 |
Roof Support Posts (F) |
| 8 |
2" x 3.5" Rafters |
| 8 |
Fascia Boards |
| 8 |
T&G Roof Sections |
| 8 |
Pagoda Rail Sections |
| 8 |
2" x 3.5" Rafter
End Caps |
|
| Cupola Roof Includes:: |
| Qty |
|
| 8 |
Roof Support Posts (F) |
| 8 |
2" x 3.5" Rafters |
| 8 |
Fascia Boards |
| 8 |
T&G Roof Sections |
| 8 |
Cupola Rail Sections |
| 8 |
2" x 3.5" Rafter
End Caps |
|
|
| |
| Required Tools |
| Tape Measure |
Plastic Mallet |
| Chalk Line |
Screw Driver (Screw Gun) |
| Carpenters Square |
Drill (1/2" Masonry Bit) |
| Carpenters Level |
Socket Wrench 1/2" |
| |
(2 ea) 8' A-Frame Ladder |
|
|
|
| |
|
|
 |
|
Universal Post Kit: Steel reinforcements posts inserts (required
for most installs)
Note: When ordering rose scrolls your gazebo kit will
be shipped without the upper post trim as it is not needed with
the rose scroll options
Accessories and options may change without notice.
|
|
| |
|
Important Before Starting
Installing your Tiffany gazebo requires two people.
Please inventory the parts for your new Tiffany Gazebo.
These instructions cover the installation of the Tiffany (base unit),
Tiffany Classic and the Tiffany Premiere. The list above will help you
determine the parts that come with style kit you ordered, these will vary
depending on your particular kit. Familiarize yourself with the drawing
shown above as it will be used as a reference throughout the instructions.
If you run into any difficulties or are missing any parts, please contact
A Vinyl Fence before starting the installation. If you proceed with the
installation, Finyl Vinyl will not be responsible fo rthe extra labor
if any to fix problems that may occur.
|
| |
| Planning and Layout |
| Post Installation: |
| This is the most important step of
your gazebo installation. It is critical that your posts be
accurately placed and level. |
|
A
|
Make sure that your slab or deck is level (if it is not, you
will need to adjest the length of the posts *) |
|
B
|
Get the dimensions for your size gazebo from the chart (Fig.
1) |
|
C
|
Locate and mark the centerpoint of your installation site
(usually the center of your slab or deck) |
|
D
|
Draw a circle, dimension "A" using this center point.
(Fig. 1).
(Make a compass of a lumber strip as lumber will not stretch
like string.) |
|
E
|
Determine where your gazebo doorway will be. Start your layout
at the right post of the doorway. (doorway post "A") |
|
F
|
Snap a line from the center of hte doorway post location to
far side of circle biscecting the center point of the slab (chalk
line "A") |
|
G
|
Using a carpenters square or the 3-4-5 method draw a line
(chalk line "b") at a 90 degree angle to (chalk line
"a") |
|
H
|
To locate the next set of posts, measure from center point
(post "A") to center point (post "B") this
gives you dimension "C" |
|
I
|
Make a mark at the 1/2 way point of dimension "C",
draw a line bisecting this mark and the center point of the
slab. This will give you chalk line "C" |
|
J
|
Repeat steps "H & I" to get final post locations |
|
K
|
Check dimension "C" measurements for all posts as
posts must be set at correct distance to proceed. |
|
 |
|
| |
|
* Determining Slab Level
Measure the level of your slab with a carpenters level or line level.
If you find that your slab or deck is not level and can not be made level
you will have to cut the gazebo posts at the bottom to compensate for
the slope.
Important:
These instructions are a guide and may not cover every circumstance.
The installer should determine and implement appropriate installation
techniques for each situation. Finyl Vinyl Inc. will not be responsible
for improper or unsafe installations.
|
| |
| Post Installation |
|
Drill 1/2" hle for Red Head Bolt (WS-1226 or equivalent recommended)
at center point of post location. Level post insert with carpenters
or post level (shim as necessary) and bolt to slab. Repeat until
all inserts are in place.
If you are using post inserts with two hole pattern, drill two
holes and install both Red Head Bolts.
|
|
|
Sleve Vinyl Posts over insters. (IMPORTANT: if your kit includes
post & base trim, install them now, once the gazebo is assembled
you can not install these items).
Make sure that the dorway posts are in hte correct location as
they only have rail holes on one side (If your gazebo is electrical
ready ghoose the post).
|
 |
|
| |
| Rafter Assembly |
|
This is a two person operation
|
|
Insert 2" x 6" rafters into posts and center support
(as shown in Fig. C & D). Secure rafters with screws
on the inside of the center support unit, this will prevent rafters
from slipping out during hte rest of the project. (Fig c2)
Insert 1" dowel pins (as shown in Fig. D. Pins must be
installed with slot facing hte outer perimeter of the gazebo).
|
 |
|
Insert small 4" diameter tube into center core and secure
with screw (as shown in FIg. F)
Note: screw should not penetrate the outside tube.
|
 |
 |
| Insert upper rail assemblies, all eight sides. (as
shown in Fig. F) |
 |
|
Thread cable through outermost pin of each post.
(Fig. G cable will be used to cinch unit during the balance of
the installation the cable remains a permanent part of the gazebo)
Note: Turnbuckle should be in full open position to facilitate
tightening when first installing cable system. Tighten the cable
to obtain the same between post dimensions (Fig G Dimension A) at
the top of the posts as at the bottom.
|
 |
 |
|
| |
| Roof Assembly |
| Tiffany Classic & Tiffany Premiere only:
Assemble pagoda roof supports and rafters (Classic & Premiere),
assemble Cupola (Premiere only), (as shown in Fig H & I) |
|
| Insert roof panels. The roof panels for each section
are interchangeable and may be used in any section. Main roof, pagoda
and cupola roofs are assembled in the same manner. (be sure to
start with upper roof, i.e. cupola or pagoda. Install center top cap
& rain collar before closing up last foor section as it will be
very difficult to reach this area of the roof after the roof is completely
assembled). |
|
| Install fascia board around all roof sections. (fascia
boards are a tight fit and may require some effort to install, the
vinyl material is quite sturdy and wil withstand a substantial amount
of force) |
|
| Secure fascia boards with screws, make sure that spacing
between fascia boards is even at rafter ends (as shown Fig. K)
glue end caps in place at this time) |
|
|
| |
| Lower Rail Assembly |
|
Insert lower rail sections, center the rail sections and secure
with screws an dscrew caps. (as shown Fig. L)
Move post trim into place and glue, caulk with white silicone caulking.
|
 |
|
| |